MARA to buy Long Ridge for ~$1.5B, gaining 505 MW plant and 1,600+ acres for AI data center and bitcoin ops
MARA Holdings agreed to acquire Long Ridge Energy & Power in a roughly $1.5 billion deal that adds a large gas-fired power plant and land for an AI and data center campus.
MARA Holdings reached an agreement to buy Long Ridge Energy & Power for about $1.5 billion in total consideration, including assumed debt; the acquisition includes a 505 MW combined-cycle gas power plant in Hannibal, Ohio, and more than 1,600 contiguous acres that together offer over 1 GW of potential power capacity for future buildout [1] [2] [3].
Company statements and reporting frame the purchase as the anchor for a flagship AI campus and part of a broader strategy to integrate energy infrastructure with compute capacity, positioning the site for AI and other IT development as well as continued bitcoin-related operations [4] [1] [2].
Market coverage noted a positive investor reaction to the transaction, and filings or analyst summaries project the Long Ridge facility could materially increase MARA’s controlled power generation (roughly a 65% increase) and contribute significant operating EBITDA—reports cite a projected roughly $144 million in annual adjusted EBITDA for the asset [3] [5].
The deal expands MARA’s energy and land footprint to support data center and compute expansion tied to AI and existing crypto operations, while adding near-term financial and capacity benefits to the company’s infrastructure base [4] [1] [2] [3].
Anonymous signal used only for weekly cluster rankings. No public counters.
Share
Broadcast this coverage
Copy-ready links for the networks your audience checks first.
Support independent reporting
If this summary helped, a small tip helps keep ClusterWire running.
Privacy note: we log tip UI events (page + action, and article slug when applicable) to improve the feature. We don’t store IP address, user-agent, or wallet addresses in analytics. Tips are on-chain, so the sending address is public in the transaction.
Citations
Follow the primary reporting behind this analysis. Click a citation to open the referenced source in a new tab.
- 1MARA Holdings to buy Long Ridge Energy in $1.5 billion AI data center pushCoinDesk• Apr 30, 2026
- 2MARA’s $1.5 Billion Long Ridge Deal Adds Power Capacity for AI and Bitcoin MiningCryptoProwl.com• Apr 30, 2026
- 3MARA Holdings (MARA) Stock Surges on $1.5B Long Ridge Energy AcquisitionBlockonomi• Apr 30, 2026
- 4MARA bets $1.5 billion on Ohio power plant to anchor flagship AI campusCrypto Briefing• Apr 30, 2026
- 5MARA Holdings (MARA) Stock Surges on $1.5B Power Plant Acquisition for AI ExpansionMoneyCheck• Apr 30, 2026
Themes
Themes driving this story
Curated from the cluster of sources powering this article.